December 23, 2024This Concept Engineering Report (CER) provides descriptions of facilities developed by the Delta Conveyance Design and Construction Authority (DCA) and adopted by the California Department of Water Resources (DWR) following preparation of an environmental assessment of the proposed Delta Conveyance Project (DCP or Project). The CER includes a summary report, appendices, engineering concept drawings (Volume 2), and Geographic Information System (GIS) Mapbook (Volume 3) showing the location of the Project facilities.
001 – Delta Conveyance Project Concept Engineering Report
Appendix A1 Hydraulic Analysis Criteria
Appendix A2 Hydraulic Analysis of Delta Conveyance Options
Appendix B1 Sacramento River Flood Flow Hydraulic Modeling – HEC-RAS 2D
Appendix B2 River Hydrologic Criteria for Intake Sizing
Appendix B3 Sacramento River Hydraulic Modeling – HEC-RAS 2D to Support Aquatic Effects Analysis
Appendix B4 Intake Structural Configuration and Fish Screen Type Analysis
Appendix B5 Existing Surface Water Diversions – Intakes
Appendix B6 Intake Site Identification and Evaluation
Appendix B7 Intake Screen Sizing – North Delta Intakes
Appendix B8 Intakes River Sediment Analysis – North Delta Intakes
Appendix B9 Intakes Operations and Maintenance Equipment and Facility Needs
Appendix B10 Conceptual Intake Cofferdam Construction
Appendix B11 Intake Flood Management
Appendix B12 North Delta Intake Facilities Configuration, Construction, and Operations
Appendix B13 Dewatering Estimates for Intake Facilities
Appendix C1 Tunnel Excavation and Drive Assessment
Appendix C2 Conceptual Tunnel Lining Evaluation
Appendix C3 Tunneling Effects Assessment
Appendix C4 Shaft Conceptual Design
Appendix C5 Shaft Siting Study
Appendix C6 Reusable Tunnel Material
Appendix C7 Tunnel Inspection and Maintenance Considerations
Appendix D1 Facilities Siting Study
Appendix D2 Bethany Pumping Plant Basis of Conceptual Design Criteria
Appendix D3 Bethany Reservoir Pumping Plant Facilities and Site Configuration
Appendix D4 Bethany Reservoir Aqueduct Surge Protection Alternatives
Appendix D5 Conceptual Development of Aqueduct and Discharge Structure
Appendix E1 Logistics Strategy
Appendix E2 Potential Road Access Routes
Appendix E3 Rail Potential Study
Appendix E4 Project Emergency Response Plan
Appendix E5 Preliminary Precast Yard Study
Appendix F1 Flood Risk Management
Appendix F2 Levee Vulnerability Assessment
Appendix G1 Concept Seismic Design and Geohazard Criteria
Appendix G2 Liquefaction and Ground Improvement Analysis
Appendix G3 Concept Design Seismic Site Response Analysis
Appendix G4 Soil Balance
Appendix G5 Potential Future Field Investigations
Appendix H1 Summary of Known Utility Crossings
Appendix H2 Electrical Power Load and Routing Study
Appendix H3 SCADA/Communications Routing and Basic Design Approach
Appendix I1 Post-Construction Land Reclamation
Appendix I2 Efforts to Minimize Delta Community Effects
General Drawings
Intake Drawings
Tunnel and Shaft Drawings
Bethany Reservoir Pumping Plant Drawings
Bethany Reservoir Aqueduct Drawings
Levee Drawings
Highway and Road Drawings
Rail Drawings