Monthly Board Report – May 16, 2024


.
May 16, 2024

Monthly Board Report – May 16, 2024

Monthly project summary report to the board for May 2024
May 14, 2024

2023 Bethany Total Project Cost Estimate

The Delta Conveyance Design & Construction Authority (DCA) prepared this memorandum to document the updated estimate of total project costs for the Bethany Reservoir Alignment of […]
April 24, 2024

Tunneling Fact Sheet

Using a team of world-class engineers with decades of tunneling experience, the Delta Conveyance Design & Construction Authority (DCA), working at the direction of the Department […]
April 18, 2024

Monthly Board Report – April 18, 2024

Monthly project summary report to the board for April 2024
March 8, 2024

Monthly Board Report – March 08, 2024

Monthly project summary report to the board for March 2024
March 7, 2024

Seismic Resilience Fact Sheet

The Sacramento-San Joaquin Delta is in the eastern part of the San Francisco Bay Area, one of the most seismically active areas in the United States. […]
March 7, 2024

Pile Driving Fact Sheet

Piles are a common construction material for major infrastructure. Driving piles into place through traditional impact driving can create considerable noise. The Delta Conveyance Design and […]
March 7, 2024

North Delta Traffic Fact Sheet

Modernizing the State Water Project requires construction activity in parts of the northern Sacramento-San Joaquin Delta. Construction activities for this type of project necessarily require the […]
March 7, 2024

Launch Shaft Fact Sheet

Launch shaft sites are the largest land footprints of the Delta Conveyance Project given the acreage it takes to place tunnel boring machines into the ground, […]
March 7, 2024

Intakes Fact Sheet

Constructing new intakes in the northern Sacramento-San Joaquin Delta is foundational to modernizing the State Water Project via the Delta Conveyance Project. The Delta Conveyance Design […]
February 15, 2024

Monthly Board Report – February 15, 2024

Monthly project summary report to the board for February 2024
February 6, 2024

Reusable Tunnel Material Fact Sheet

The soil excavated by the Tunnel Boring Machines (TBMs) in the construction of the Delta Conveyance Project will consist of mostly sand, silt, and clay, and […]