This Concept Engineering Report (CER) provides descriptions of facilities developed by the Delta Conveyance Design and Construction Authority (DCA) and adopted by the California Department of […]
A strategically located set of facilities pumps water from the Delta Conveyance Project tunnel after its 45-mile journey to the Bethany Reservoir Pumping Plant. From there, […]
Crestline-Lake Arrowhead Water Agency is a public agency created in 1962 by a special act of the California State Legislature to provide supplemental water to a […]
The purpose of this Delta Conveyance Design and Construction Authority (DCA) Disposal of Surplus Personal Property Policy is to set forth the procedures for the disposition […]
The Delta Conveyance Design & Construction Authority (DCA) prepared this memorandum to document the updated estimate of total project costs for the Bethany Reservoir Alignment of […]