Do you plan to rehabilitate the levees at launch sites and to what level in order to protect construction operations?
June 12, 2020How many miles are between the Eastern Corridor’s Launch Site B to the Port of Stockton?
June 12, 2020All construction between tunnel shafts is anticipated to be located at the TBM below the ground. Dewatering would not occur along the tunnel alignment between tunnel shafts. No pipelines would be constructed along the tunnel alignment between tunnel shafts. Power line alignments have not been developed at this time.