When peat dirt is displaced, what mitigation efforts will be made to make sure the peat doesn’t increase the asthma problems in the Delta?
June 12, 2020Are there going to be activities such as dewatering, power lines or pipelines between the launch shafts in addition to construction of the launch shaft sites?
June 12, 2020The work areas at the tunnel launch sites would be placed on elevated pads to protect the site from the 200-year flood event, sea level rise and wind fetch with a specified freeboard height.