The Delta Conveyance Design & Construction Authority (DCA) prepared this memorandum to document the updated estimate of total project costs for the Bethany Reservoir Alignment of […]
This letter report presents the findings of the Delta Conveyance Intakes Independent Technical Review (ITR) Panel from its March 17-19, 2020 Skype meeting. In addition to […]
From 2012–2016 much or all of California was under severe drought conditions, with greatly diminished precipitation, snowpack, and streamflow and higher temperatures. This drought was broad […]
Several studies on the Sacramento River provide evidence for the distribution of outmigrating fish (specifically juvenile salmonids) toward the outer sides of bends, including at Clarksburg […]
This letter report presents the findings of the Delta Conveyance Tunneling and Shafts Independent Technical Review (ITR) Panel from its May 13 to 15, 2020 Skype […]
During the December meeting of the Design and Construction Agency’s (DCA) Stakeholder Engagement Committee (SEC), stakeholders requested additional information about how the SEC’s role would be […]
Portions of the Delta are underlain by extensive oil and gas deposits and numerous wells have been installed since the fields were first developed. Additionally, portions […]
Currently, the SWP Delta water conveyance facilities include Clifton Court Forebay and the Banks Pumping Plant in the south Delta that enable the Department to divert […]