The potential tunnel alignments and shaft locations in the Central and Eastern Corridor are still being developed. At this time, it appears that two tunnel launch shafts would be located within the footprint of the Southern Forebay and two to three tunnel launch shafts per corridor would be located to the north of the Southern Forebay.