Home > FAQs > Why all of this for one region?
The ITR report sought to determine if CEQA could have an approach for the unknowns. How can that comment be assimilated? The Big Bertha TBM used on the Alaska Way Viaduct got stuck 1,000 feet into the tunnel drive. How is that type of possibility going to be addressed from the engineering point of view?
June 12, 2020
Where will water pumped in the dewatering process go?
June 12, 2020