Home > FAQs > Are the maintenance and retrieval shafts being kept or filled after construction of the project?
If heavy concrete is put on top of these soils, how will the sites be stable?
June 12, 2020
What flood standard is being used to determine the height of the shaft pads compared to what DWR has analyzed in the fourth climate change assessment for storm surge and downstream flood risk?
June 12, 2020