Home > FAQs > Will there be discussion about the flow capacity used, and will it be pressurized or not pressurized?
Will the sediment basin be lined and, if not, will the basins be in groundwater from 4 or 5 feet below existing ground level and below? Does DCA expect the slurry walls to keep them out of the groundwater?
June 15, 2020
Is the corridor that was proposed through the Deep Water Ship Channel with an intake near Rio Vista still a possibility?