
2020 Intakes ITR Report
March 3, 2022
JEPA Amendment 6 – April 22, 2022
April 22, 2022
In October 2019, the Delta Conveyance Design & Construction Joint Powers Authority (DCA) Board formed a Stakeholder Engagement Committee (SEC) of community members who live and/or work in the Sacramento-San Joaquin River Delta. The SEC was designed to create a forum where members of the public, designated committee members and DCA technical teams could exchange information, providing a better understanding of the technical components of a proposed single-tunnel Delta Conveyance Project (DCP), while allowing the project staff to gather early input related to ways the design could reduce adverse construction and footprint design effects to the local Delta community. The intent was that the project team would be able to integrate community-focused modifications into the planning and conceptual design of the proposed project to minimize and/or avoid potential negative effects wherever possible. With input from SEC members at the early design phase prior to completion of the Draft Environmental Impact Report (EIR), DCA engineers identified several design and logistics strategies to avoid and/or minimize potential construction effects anticipated from the development of the proposed project.