It could be possible to provide some type of vegetation at portions of the intake locations following construction. Riparian habitat disturbed upstream and downstream of the intake during construction could be replaced in accordance with USACE and DWR criteria. Other areas on the intake site could also be considered for habitat plantings. Upland habitat could be considered between the intake structure and the highway at the same elevation as the top of the levee. Irrigation could be provided to help facilitate the diversity of plants. These concepts would be independent of the type of intake screens.