As currently proposed, the maintenance shaft sites would only be sized to remove the cutter head. The launch shaft sites would be sized to lift the segments into the tunnel, for tunnel boring machine trailing gear and for reusable tunnel material handling and storage. The large launch shaft site would only be required every 12 to 15 miles.